This project featured the installation of approximately 8,720 linear feet of 27- to 30-inch (700 to 800mm) Superlit FRP gravity sewer pipe. Each section was joined using Full Face® FRP couplings, ensuring a leak-free, corrosion-resistant, and flexible joint system capable of accommodating minor angular deflections. Installation combined open-cut excavation and tunneling, with FRP pipes installed inside steel casings in sensitive areas to minimize surface disruption.