The project features the installation of 900 mm (36 in) FRP pipes manufactured by SUPERLIT, engineered for a minimum nominal pressure of 150 psi and using the restrained joint system with Full Face® FRP couplings. This solution ensures the system's leak-tightness, corrosion resistance, and installation flexibility. Over 60 custom fittings were designed and manufactured to accommodate the project layout. Complying with NSF/ANSI 61, ASTM D3517, and BNQ certification, the project contributes to a sustainable and resilient drinking water system for the West Island community of Montreal.